Business Problems and Recommended Smart Stock Workflows
Choose the correct Niyu Smart Stock control for common purchasing, stockout, warehouse, demand, quantity, and setup problems.
Start from the business problem, then use the narrowest control that represents it. Do not force every exception into a global setting or a manual purchase override.
Cadence
Supplier orders are weekly, monthly, or quarterly
Ordering Profile + matching Planning Rule
Demand
A spike, promotion, or closure distorts history
Demand Review or confirmed Demand Event
Availability
Zero stock made sales look too low
Stockout Handling + Demand History
Network
One warehouse is short and another has safe surplus
Transfer Network + internal rebalancing
Execution
The buyer wants a different quantity
Planner Purchase Quantity
Units
Supplier sells cases, packs, or MOQ quantities
UoM + Planning Rule order constraints
We order from a supplier only every 30, 60, or 90 days
Create a recurring Ordering Profile with the real interval, anchor date, and preparation window. Link it through the matching Planning Rule. The recommendation then protects the lead time, interval until the following review, and safety days before deducting timely supply.
Follow the exact setup and verify the protection period.
Set recurring or manual purchasingWe consolidate factory or container orders
Use one Ordering Profile to align the vendor review date. Use Vendor Order Review to review the complete vendor/profile/date group. Add a Purchase Schedule Profile only when the approved quantity should arrive in separate batches.
A storm, tender, promotion, or wholesale order created a spike
If the period is already known, create and confirm Demand Events before the next sync. If the sync discovered it, review the flagged lines in bulk and run one follow-up sync. Do not use Planner Purchase Quantity as the historical correction.
Choose normal demand, baseline replacement, cap, stockout handling, or a dated future uplift.
Review exceptional demandLow sales may be caused by out-of-stock days
Open Demand History for the product and warehouse. Compare recorded demand with monthly out-of-stock days. Use Flag only for visibility, Estimate constrained demand only with dependable evidence and backend support, or Ignore availability when unmet demand is already captured elsewhere.
Use product-specific overrides for made-to-order, project, service, seasonal, intermittent, or backorder workflows.
Choose stockout treatmentAnother warehouse has stock
Enable internal rebalancing, define legal warehouse relationships through the global scope or Transfer Networks, and use Planning Rules for product and warehouse exceptions. Create timely transfers first, then buy only the uncovered balance.
Set hub, store, source-only, protected, and transfer-only patterns.
Configure warehouse rebalancingThe recommendation is decimal or ignores case packs
Keep demand forecasts decimal. Configure stock-UoM rounding, purchase UoM conversion, Order Step, Case Pack, MOQ, and supplier minimums so the executable RFQ is valid. Internal transfers use stock-UoM precision and do not inherit supplier pack rules.
Reconcile planner quantity, executable stock units, and RFQ purchase units.
Correct UoM and order constraintsThe buyer wants to order more, less, or zero
Set Planner Purchase Quantity and enter the business reason. The value survives later forecasts, including an explicit zero. Reset it when the system suggestion should become active again. A confirmed PO is never silently changed.
Review changed suggestions and linked draft RFQs safely.
Use Planner Purchase QuantityThe line says Setup Required
Open Readiness & Setup or the Control Tower exception drawer. Correct the named source: vendor, Planning Rule, ordering dates, transfer route, warehouse role, UoM, forecast horizon, or linked document. Run a new forecast only when the correction affects the planning snapshot.
The required planning window exceeds the forecast horizon
The sync requests the largest horizon required by active Planning Rules, capped by the service plan. Use Show Lines on the Control Tower warning, correct accidental lead-time or cadence settings, or arrange a supported longer backend horizon. Dashed run-rate projection is visual context, not a purchase quantity.
Use the right layer
Demand Events change copied forecast input. Planning Rules change policy. Planner Purchase Quantity changes the current executable buy. RFQs and transfers are the final Odoo documents. Keeping these layers separate makes later review understandable.
Follow the source-to-decision diagnostic sequence for unexpected results.
Open the troubleshooting guideForecast Runs, Syncs, Quotas, and Lead-Time Review
Start and monitor forecast runs, understand refresh limits, diagnose active jobs, and turn receipt evidence into reviewed Planning Rules.
Continuous, Recurring, and Manual Purchasing
Model daily review, fixed vendor cycles, containers, and manual buying dates with a transparent protection window.
